Reviews
Description
The objective of this work is to evaluate technically and economically the drilling and blasting of 20 feet fronts, through the tests carried out in CÃa. Minera Condestable, which allowed me to change the drilling system from 14 to 20 feet, which resulted in greater progress in emergency work.The method of exploitation of long holes in breaches and seams, makes a requirement of several meters of preparation work for long drilling equipment and development as galleries, sublevels etc, to reach the ore. In the mine there are 2 shifts (day and night) and only blasting is done at 6:30 a.m. and 6:30 p.m., therefore, only two shots of 14 feet can be made in the same work, now if the work is urgent the shots would be implemented with the 20 feet giving more progress at a higher cost as we will see in the results obtained.
EXTRA 10 % discount with code: EXTRA
The promotion ends in 23d.13:01:16
The discount code is valid when purchasing from 10 €. Discounts do not stack.
The objective of this work is to evaluate technically and economically the drilling and blasting of 20 feet fronts, through the tests carried out in CÃa. Minera Condestable, which allowed me to change the drilling system from 14 to 20 feet, which resulted in greater progress in emergency work.The method of exploitation of long holes in breaches and seams, makes a requirement of several meters of preparation work for long drilling equipment and development as galleries, sublevels etc, to reach the ore. In the mine there are 2 shifts (day and night) and only blasting is done at 6:30 a.m. and 6:30 p.m., therefore, only two shots of 14 feet can be made in the same work, now if the work is urgent the shots would be implemented with the 20 feet giving more progress at a higher cost as we will see in the results obtained.
Reviews