230,39 €
255,99 €
-10% with code: EXTRA
Make-To-Order Assembly Management
Make-To-Order Assembly Management
230,39
255,99 €
  • We will send in 10–14 business days.
Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma- chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi- level make-to-order manufacturing systems. We assume that the facil- ity design issue is settled, i.e., t…
  • Publisher:
  • Year: 2000
  • Pages: 260
  • ISBN-10: 3540410988
  • ISBN-13: 9783540410980
  • Format: 15.6 x 23.4 x 1.8 cm, hardcover
  • Language: English
  • SAVE -10% with code: EXTRA

Make-To-Order Assembly Management (e-book) (used book) | bookbook.eu

Reviews

Description

Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma- chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi- level make-to-order manufacturing systems. We assume that the facil- ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex- isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi- neers and by the availability of construction devices such as computer aided design (CAD) systems etc.

EXTRA 10 % discount with code: EXTRA

230,39
255,99 €
We will send in 10–14 business days.

The promotion ends in 20d.23:50:29

The discount code is valid when purchasing from 10 €. Discounts do not stack.

Log in and for this item
you will receive 2,56 Book Euros!?
  • Author: Rainer Kolisch
  • Publisher:
  • Year: 2000
  • Pages: 260
  • ISBN-10: 3540410988
  • ISBN-13: 9783540410980
  • Format: 15.6 x 23.4 x 1.8 cm, hardcover
  • Language: English English

Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma- chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi- level make-to-order manufacturing systems. We assume that the facil- ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex- isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi- neers and by the availability of construction devices such as computer aided design (CAD) systems etc.

Reviews

  • No reviews
0 customers have rated this item.
5
0%
4
0%
3
0%
2
0%
1
0%
(will not be displayed)