113,57 €
126,19 €
-10% with code: EXTRA
Integrated Scheduling of Continuous Casters and Hot Strip Mills
Integrated Scheduling of Continuous Casters and Hot Strip Mills
113,57
126,19 €
  • We will send in 10–14 business days.
Continuous casting and hot strip milling are two successive production steps in the steel industry. In her thesis Imke Mattik develops model formulations to integrate the scheduling of continuous casters and hot strip mills. Aim is to reduce the waiting times of the pre-products, called slabs, between the production steps and at the same time to reduce the energy consumption. Along with two different model formulations extensive numerical tests and comparative analyses are provided.
126.19
  • Publisher:
  • Year: 2013
  • Pages: 120
  • ISBN-10: 3658037741
  • ISBN-13: 9783658037741
  • Format: 14.8 x 21 x 0.8 cm, minkšti viršeliai
  • Language: English
  • SAVE -10% with code: EXTRA

Integrated Scheduling of Continuous Casters and Hot Strip Mills (e-book) (used book) | bookbook.eu

Reviews

(4.00 Goodreads rating)

Description

Continuous casting and hot strip milling are two successive production steps in the steel industry. In her thesis Imke Mattik develops model formulations to integrate the scheduling of continuous casters and hot strip mills. Aim is to reduce the waiting times of the pre-products, called slabs, between the production steps and at the same time to reduce the energy consumption. Along with two different model formulations extensive numerical tests and comparative analyses are provided.

EXTRA 10 % discount with code: EXTRA

113,57
126,19 €
We will send in 10–14 business days.

The promotion ends in 21d.13:31:14

The discount code is valid when purchasing from 10 €. Discounts do not stack.

Log in and for this item
you will receive 1,26 Book Euros!?
  • Author: Imke Mattik
  • Publisher:
  • Year: 2013
  • Pages: 120
  • ISBN-10: 3658037741
  • ISBN-13: 9783658037741
  • Format: 14.8 x 21 x 0.8 cm, minkšti viršeliai
  • Language: English English

Continuous casting and hot strip milling are two successive production steps in the steel industry. In her thesis Imke Mattik develops model formulations to integrate the scheduling of continuous casters and hot strip mills. Aim is to reduce the waiting times of the pre-products, called slabs, between the production steps and at the same time to reduce the energy consumption. Along with two different model formulations extensive numerical tests and comparative analyses are provided.

Reviews

  • No reviews
0 customers have rated this item.
5
0%
4
0%
3
0%
2
0%
1
0%
(will not be displayed)