111,68 €
124,09 €
-10% with code: EXTRA
Critical Examination of C-130 Programmed Depot Maintenance (Pdm) Induction Methodology
Critical Examination of C-130 Programmed Depot Maintenance (Pdm) Induction Methodology
111,68
124,09 €
  • We will send in 10–14 business days.
The current USAF process for establishing intervals between C-130 PDM does not account for the wide range of aircraft variables within each aircraft MDS. This paper develops an analytical model, based on five unique aircraft variables, to provide C-130 maintainers with a prediction tool to forecast when a C-130 aircraft requires PDM. These five variables include: aircraft age, total flying hours, average yearly flying hours, mission profile (expressed as a severity factor), and operating locati…
  • Publisher:
  • ISBN-10: 124941461X
  • ISBN-13: 9781249414612
  • Format: 18.9 x 24.6 x 0.2 cm, softcover
  • Language: English
  • SAVE -10% with code: EXTRA

Critical Examination of C-130 Programmed Depot Maintenance (Pdm) Induction Methodology (e-book) (used book) | bookbook.eu

Reviews

Description

The current USAF process for establishing intervals between C-130 PDM does not account for the wide range of aircraft variables within each aircraft MDS. This paper develops an analytical model, based on five unique aircraft variables, to provide C-130 maintainers with a prediction tool to forecast when a C-130 aircraft requires PDM. These five variables include: aircraft age, total flying hours, average yearly flying hours, mission profile (expressed as a severity factor), and operating location of the aircraft. Interviews with C-130 SPO personnel, combined with use of the C-130 Service Life Data Base, provided the required data to develop the C-130 PDM interval model.The C-130 PDM interval model developed in this paper allows maintainers and operators to predict the optimum time between C-130 PDM activities. It eliminates the requirement to base PDM intervals on aircraft MDS. As a result, there is a potential for significant savings by deferring PDM for a portion of the C-130 fleet. Finally, the PDM interval model developed in this paper may be applicable for other DOD aircraft which use aircraft MDS as the determinant of PDM intervals.

EXTRA 10 % discount with code: EXTRA

111,68
124,09 €
We will send in 10–14 business days.

The promotion ends in 16d.12:10:16

The discount code is valid when purchasing from 10 €. Discounts do not stack.

Log in and for this item
you will receive 1,24 Book Euros!?
  • Author: John A Daniels
  • Publisher:
  • ISBN-10: 124941461X
  • ISBN-13: 9781249414612
  • Format: 18.9 x 24.6 x 0.2 cm, softcover
  • Language: English English

The current USAF process for establishing intervals between C-130 PDM does not account for the wide range of aircraft variables within each aircraft MDS. This paper develops an analytical model, based on five unique aircraft variables, to provide C-130 maintainers with a prediction tool to forecast when a C-130 aircraft requires PDM. These five variables include: aircraft age, total flying hours, average yearly flying hours, mission profile (expressed as a severity factor), and operating location of the aircraft. Interviews with C-130 SPO personnel, combined with use of the C-130 Service Life Data Base, provided the required data to develop the C-130 PDM interval model.The C-130 PDM interval model developed in this paper allows maintainers and operators to predict the optimum time between C-130 PDM activities. It eliminates the requirement to base PDM intervals on aircraft MDS. As a result, there is a potential for significant savings by deferring PDM for a portion of the C-130 fleet. Finally, the PDM interval model developed in this paper may be applicable for other DOD aircraft which use aircraft MDS as the determinant of PDM intervals.

Reviews

  • No reviews
0 customers have rated this item.
5
0%
4
0%
3
0%
2
0%
1
0%
(will not be displayed)