32,39 €
35,99 €
-10% with code: EXTRA
Benefit-Cost Evaluation of a Highway-Railroad Intermodal Control System (ICS)
Benefit-Cost Evaluation of a Highway-Railroad Intermodal Control System (ICS)
32,39
35,99 €
  • We will send in 10–14 business days.
The Intermodal Control System (ICS) was designed by General Railway Signal Corporation (GRS, now Alstom, Inc.) for highway-rail at-grade crossings, under contract to the New York State Department of Transportation. In partnership with the Long Island Rail Road (LIRR), a site was selected for testing the ICS at the New Hyde Park station, where a grade crossing occurs close to the station. The planned project integrates train control, grade crossing control, and traffic control into a balanced sy…
  • SAVE -10% with code: EXTRA

Benefit-Cost Evaluation of a Highway-Railroad Intermodal Control System (ICS) (e-book) (used book) | bookbook.eu

Reviews

Description

The Intermodal Control System (ICS) was designed by General Railway Signal Corporation (GRS, now Alstom, Inc.) for highway-rail at-grade crossings, under contract to the New York State Department of Transportation. In partnership with the Long Island Rail Road (LIRR), a site was selected for testing the ICS at the New Hyde Park station, where a grade crossing occurs close to the station. The planned project integrates train control, grade crossing control, and traffic control into a balanced system that can make decisions affecting both train speed and highway closure.

EXTRA 10 % discount with code: EXTRA

32,39
35,99 €
We will send in 10–14 business days.

The promotion ends in 19d.12:14:40

The discount code is valid when purchasing from 10 €. Discounts do not stack.

Log in and for this item
you will receive 0,36 Book Euros!?

The Intermodal Control System (ICS) was designed by General Railway Signal Corporation (GRS, now Alstom, Inc.) for highway-rail at-grade crossings, under contract to the New York State Department of Transportation. In partnership with the Long Island Rail Road (LIRR), a site was selected for testing the ICS at the New Hyde Park station, where a grade crossing occurs close to the station. The planned project integrates train control, grade crossing control, and traffic control into a balanced system that can make decisions affecting both train speed and highway closure.

Reviews

  • No reviews
0 customers have rated this item.
5
0%
4
0%
3
0%
2
0%
1
0%
(will not be displayed)